Our Progress

Ecomatt Farm at Plot 12 Sherwood, Kwekwe, was built from open ground up. These are our own photographs of the work, stage by stage, from the first trenches to the finished pig houses you can see from the air.

How we got here

Built one course of bricks at a time

We did not buy a finished farm. Every wall, column, truss and roof sheet on this site was set by our own crews, and we photographed the work as it happened and posted it on our Facebook page.

The build followed the simplest possible order: clear and mark out the ground, dig and fill the foundations, raise the walls and columns, put the steel and roofing on, then finish and hand the buildings over to the stock. Nothing was rushed and nothing was hidden — if you have followed the page, you have watched it happen in real time.

Because this page is built from photographs rather than promises, it only claims what the pictures show. Where a stage is still in hand, it says so.

  • Purpose-built pig housing designed for ventilation, drainage and easy cleaning
  • Local crews, local bricklayers and materials barrowed to the wall by hand
  • Management on site through every phase, not just at handover
  • Buildings put straight to work — housing stock, feed and farm equipment
See the full photo gallery
Stage by stage

The build, in the order it happened

Tap any photograph to open it full size.

  1. Phase 1

    Clearing and marking out the land

    The site started as open ground. It was cleared, walked and pegged out so that the pens, the service roads and the drainage all had room before a single trench was cut. The aerial shots show the foundation lines set out across the whole development area.

    Aerial view of foundation trenches marked out across the cleared site Team crossing the cleared development site on foot The Ecomatt team inspecting the cleared ground before building
  2. Phase 2

    Foundations and brickwork

    With the trenches in, the bricklayers started. Every course was bedded, levelled and checked by hand — the slow part of any farm build and the part that decides whether a pen still stands straight in ten years.

    Newly laid brickwork for the piggery housing Laying bricks by hand, course by course Bedding a brick into fresh mortar on the pen wall Levelling the wall with a spirit level as the courses go up
  3. Phase 3

    Walls and columns rising

    The pen lines took shape as the brick columns came up to height. Mortar was mixed on site and barrowed straight to the wall so the bricklayers never stopped, and the long pillar lines set the spacing for the roof that was coming.

    Brick columns and foundations going up at sunset Brick pillars rising along the new pen line Mortar barrowed straight to the bricklayers at the wall Bricklayers at work on the pen walls
  4. Phase 4

    Steel and roofing

    Steel trusses went up over the finished walls and the long structure finally read as a building. Roofing matters more than it looks on a pig unit: it sets the shade, the airflow and how dry the pens stay when the rains come.

    Steel roof trusses erected over the new pens The long steel-framed structure taking shape Moving materials across the site by wheelbarrow Barrowing mortar along the length of the block
  5. Phase 5

    Buildings completed

    Shells closed up, floors and finishes went in, and the crew worked down the block on the last details. These are the buildings as they were handed over — clean, roofed and ready for stock and feed.

    The completed shell of the new farm block Crew finishing the long farm block Final touches being made on the new building A completed farm building with new roofing
  6. Phase 6

    The farm today, from the air

    From above you can see what the phases added up to: a working compound of roofed pig houses, yards and service ground. The stock moved in as each house was finished, and the piggery has been running out of these buildings ever since.

    Aerial view of the growing Ecomatt farm compound Aerial view of the completed pig houses Aerial view of the farm with new roofing across the blocks Pigs outside their new housing after moving in
The team behind it

People on site, not plans on paper

Management walked the build with the crews — checking setting-out, brickwork and roofing as it went up rather than signing it off afterwards.

The Ecomatt team on a site inspection during the build

Site inspection

Walking the ground before the trenches went in, checking that the layout worked for stock movement, feed delivery and drainage.

Management and site team walking the new structure

Walking the new structure

Management and the site team through the shell once the walls were up, agreeing the finishes before the roofing went on.

Leadership reviewing construction progress on site

Leadership review

Progress reviewed on the site itself, with the work in front of everyone, so that problems were fixed in the same week they appeared.

Site team briefing at the new build

Daily briefing

The crew briefed on the day's targets at the wall — who is laying, who is mixing, and what has to be closed off before knock-off.

Project team standing on the construction site

The project team

The people who carried the build: bricklayers, general hands, drivers and the management running the programme.

Team walk-through of the expansion works

Expansion walk-through

Reviewing the next stage of works on the ground — what the farm still needs, and in what order it makes sense to build it.

Who is leading it

The people accountable for the farm

Three names carry the work: the business, the build programme and the day-to-day running of the farm.

Where we are now

The farm in numbers we can stand behind

No projections and no rounded-up claims — just what we have published and what is running today.

19,000 Followers on our Facebook page
83 Photographs published from the farm
10 Short farm videos you can watch here
6 Build stages documented on this page
Watch the build

Progress on film

Two short clips from the build and the land preparation that went with it. They play here, straight from our Facebook page.

We post the progress as it happens

Every photograph on this page came from our Facebook page, where 19,000 followers watch the farm grow. Follow us to see the next stage first — or call +263 71 474 5653 to arrange a visit and see it in person.

Follow on Facebook
Keep looking around

More of the farm

The full picture set and every clip we have posted, plus a direct line if you would rather walk the farm yourself.

Completed Ecomatt farm buildings in the landscape

Photo gallery

All 83 photographs from the farm — the herd, the crops, the crews and the buildings — filterable and full screen.

Open the gallery
Site meeting in front of the new farm block

Farm videos

Ten short films from the piggery, the lands, the store and the build, playing straight from our Facebook page.

Watch the videos
Ecomatt crew at work on the new farm block